Erosion control on Red Hill

A report has been completed following an inspection in early 2015 of erosion issues on Red Hill. The report focusses principally on a major erosion gully located upslope from the main Mugga Way car park.  In some places this erosion gully is over 4m deep and is actively eroding.  The report provides suggested methods for addressing this erosion. More…